Trending...
- Diversified Roofing Solutions Strengthens Industry Leadership With Expanded Roofing Services Across South Florida
- Off The Hook YS (NY SE: OTH) Executes Transformational Apex Acquisition, Creating Vertically Integrated Marine Powerhouse with $60M Inventory Capacity
- François Arnaud, star of Heated Rivalry, is the real-life inspiration behind Christopher Stoddard's novel At Night Only
Titusville, FL: David Boland, Inc. has been awarded a firm-fixed-price contract for the Army Reserve Center project near Asheville, North Carolina
ASHEVILLE, N.C. - ncarol.com -- On 20 June 2024, the U.S. Army Corps of Engineers awarded David Boland, Inc. ("Boland"), located on the Space Coast of Florida, the contract for the new 300-member U.S. Army Reserve Center project near Asheville, North Carolina. The project is planned to be performed within a duration of two years and has a contract value of $32M. This will be the second Army Reserve Center constructed by Boland for the Louisville District.
More on ncarol.com
The project will include construction of an approximately 31,000-square-foot Army Reserve Center, a 10,000-square-foot Vehicle Maintenance Shop, a 1,500-square-foot Unheated Storage building, an 800-square-foot Wash Rack building, a bi-level loading ramp, and substantial areas for military equipment parking on approximately 20 acres of property acquired by the Department of the Army in Flat Rock, North Carolina.
The project will incorporate anti-terrorism / force protection, physical security, cybersecurity, and high performance and sustainable building measures.
Click here to learn more about David Boland, Inc. and see what opportunities are available.
More on ncarol.com
- Mecpow M1: A Safe & Affordable Laser Engraver Built for Home DIY Beginners
- CrashStory.com Launches First Colorado Crash Data Platform Built for Victims, Not Lawyers
- Inkdnylon Earns BBB Accreditation for Verified Business Integrity
- Josh Stout "The Western Project"
- Open House Momentum Builds at Heritage at South Brunswick
The project will include construction of an approximately 31,000-square-foot Army Reserve Center, a 10,000-square-foot Vehicle Maintenance Shop, a 1,500-square-foot Unheated Storage building, an 800-square-foot Wash Rack building, a bi-level loading ramp, and substantial areas for military equipment parking on approximately 20 acres of property acquired by the Department of the Army in Flat Rock, North Carolina.
The project will incorporate anti-terrorism / force protection, physical security, cybersecurity, and high performance and sustainable building measures.
Click here to learn more about David Boland, Inc. and see what opportunities are available.
Source: David Boland, Inc.
0 Comments
Latest on ncarol.com
- Cummings Graduate Institute for Behavioral Health Studies Honors New Doctor of Behavioral Health Graduates
- IDpack v4 Launches: A Major Evolution in Cloud-Based ID Card Issuance
- CCHR Says Psychiatry's Admission on Antidepressant Withdrawal Comes Far Too Late
- 505 Plumbing, Heating & Cooling Launches in Albuquerque, Bringing a Customer-First Approach to Home Services
- As AI.com Sells For Record $70 Million, Attention Now Turns To ArtificialIntelligence.com
- AOW Event Sponsored By The Stanglwirt Resort a renowned five-star Austrian wellness destination
- Average US gambler spends $210 per month in 2026
- 10X Recruitment Launches Operator-Led Executive Search for Behavioral Health and Legal Leaders
- Integris Composites developing armor for military in Arctic Circle
- Caraline Skincare's Gentle Glow Cleansing Oil Named Finalist for Best Face Cleanser at the 2026 CertClean Clean Beauty Awards
- Workplace safety ideas from the front lines to highlight Applied Ergonomics Conference in Arlington, Texas
- OpenSSL Corporation Advisory Committees' Elections 2026: Results Announcement
- Zarova Vodka Expands Its Ultra-Premium Spirits Portfolio Through Strategic Acquisitions
- The Legal AI Showdown: Westlaw, Lexis, ChatGPT… or EvenSteven?
- François Arnaud, star of Heated Rivalry, is the real-life inspiration behind Christopher Stoddard's novel At Night Only
- UK Financial Ltd Sets February 27 CATEX Debut for VENUS Coin, Opening Limited Early Access Through MayaPro Wallet
- Ice Melts. Infrastructure Fails. What Happens to Clean Water?
- Delay In Federal Disaster Assistance Causing Failure Of Small Business In Disaster Areas
- Capsadyn® Launches on Amazon, Offering Non-Burning Capsaicin Pain Relief
- When Representation No Longer Reflects the District — Why I'm Voting for Pete Verbica
